Sky Terraces by Binghatti | Motor City, Dubai | Studios to 3-Bedroom Apartments | AED 774,999 Onwards

A 40-Floor Residential Tower in Motor City, Dubai

An off-plan 40-floor residential tower by Binghatti Developers in Motor City, Dubai (within Dubai Autodrome and Business Park). The development includes 1,840 apartments plus 26 retail units at ground level. Sales launched January 1, 2026, with construction starting the following day.

Key Details

  • Location: Motor City, Dubai
  • Developer: Binghatti Developers
  • Building: Single 40-floor tower
  • Total units: 1,840 apartments + 26 retail spaces
  • Ownership: Freehold, open to all nationalities
  • Government fee: 4%
  • Sales launch: January 1, 2026 / Construction start: January 2, 2026

Unit Types, Sizes & Starting Prices

Unit Type

Size

Starting Price

Studio

383–499 sq ft

AED 700K–775K

1 Bedroom

524–1,261 sq ft

AED 1.19M–1.2M

Royal 1 Bedroom

Not specified

AED 1.599M

2 Bedroom

1,055–1,279 sq ft

AED 1.8M–1.9M

3 Bedroom

2,521 sq ft

AED 2.9M–2.924M

Retail units

Not specified

From AED 2.745M

Features & Amenities

Infinity pool, kids' pool
Steam room, sauna
Retail podium at ground level
Luxury lobby (6.75m height), 3.75m ceilings in units, 22 elevators
Landscaped gardens, children's play area
Indoor and outdoor gyms, training studio, yoga area, Pilates area

Payment Plan

Sources genuinely disagree here — stated plainly rather than picking one:

  • One source: 20% at launch → 40% during construction → 40% on handover (a “limited-time” 60/40 offer uses the same breakdown)
  • Same source’s FAQ section: 20% at launch → 50% during construction → 30% on handover
  • Second source: 70/30 structure — 10% on booking → 60% during construction → 30% on handover
    This needs direct confirmation with Binghatti’s sales team before you quote a specific plan to a prospect — three different breakdowns across two pages is more than normal listing noise.
Handover Timeline

Also inconsistent: one source states April 2028 (Q2 2028), the other states December 2027 (Q4 2027). One page additionally claims "move-in ready by Q4 2027" despite the project being off-plan — worth treating that claim with particular caution.

Strategic Location & Connectivity

  • 5 minutes to Dubai Autodrome
  • 12 minutes to Dubai Hills
  • 15 minutes to Mall of the Emirates
  • 20 minutes to Downtown Dubai
  • 25 minutes to Dubai International Airport

Investment Highlights

  • Freehold, open to all nationalities
  • Golden Visa eligible at the standard AED 2M+ threshold (applies to 2BR+ units and above based on this pricing)
  • Entry price point (studios from ~AED 700K) is accessible relative to other Dubai off-plan launches
  • Honest caveat: given the conflicting payment plan and handover date figures across sources, this is a project where verifying directly with the developer before outreach matters more than usual — don’t lead with numbers you haven’t confirmed

Answers to common questions

Studios start from roughly AED 700,000–775,000, with 1-bedroom units from around AED 1.19–1.2 million. Larger units go up to AED 2.9 million+ for a 3-bedroom. Minor price differences between listings likely reflect floor/view variations — confirm the exact unit price with your broker.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus.

This is genuinely unclear from available listings — one source cites a 20/40/40 structure, another cites 70/30 (10% booking, 60% during construction, 30% handover), and a third figure appears in an FAQ section on one of the pages. Get the exact current plan directly from Binghatti or your broker before quoting it.
Also inconsistent across sources — one lists April 2028 (Q2 2028), another lists December 2027 (Q4 2027). Worth confirming directly before committing to a date with a client.
Yes, it’s freehold and open to all nationalities. Units priced at or above AED 2 million (2-bedroom and above, based on current pricing) would meet the standard UAE Golden Visa threshold.